Oral Health Simulation Lab, University of Newcastle

New building works, Alterations and Additions

Based in the Ourimbah Campus, the Oral Health Simulation Laboratory project included an accessibility study, refurbishments and alterations to an existing multipurpose two storey building. The brief included refitting the building with a state of the art learning laboratory and associated spaces including; 16 specialist oral health simulation workstations; an x-ray room; autoclave room; wet laboratory; and tutorial, office and storage spaces. All changes were documented to enable equitable access into and through the building.